
Celtic Sea Offshore Wind Supplier Insurance UK
Quick answer
What insurance do I need to supply the Celtic Sea floating wind projects?
To get through pre-qualification for Celtic Sea floating wind work, most suppliers need employers' and public liability that cover offshore and port work, liability limits of at least £10m, contractual liability for the indemnities in the contract, and professional indemnity if they design, inspect or certify. Fabricators and storage providers also need cover for customers' components in their care. Many Welsh and South West firms already have contractor insurance, but it is often written for onshore work only and needs extending or replacing before they bid.
The Celtic Sea projects
The Celtic Sea is the UK's first large-scale floating offshore wind area. The Crown Estate's Round 5 leasing awarded three sites of around 1.5 GW each, totalling up to 4.5 GW. Equinor and Gwynt Glas, a joint venture between EDF power solutions and ESB, signed agreements for lease in October 2025, and Ocean Winds signed for the third site in March 2026. First power is expected by the mid-2030s.
Floating turbines are assembled in port and towed out, which means far more of the work happens on the coast than with fixed-bottom wind. Port Talbot is being developed as a floating wind hub, with up to £64 million of government funding announced in March 2026 for design and engineering work, subject to final approvals. Milford Haven and Pembroke Dock are also positioning for the sector. That creates opportunities for fabricators, electrical and mechanical contractors, marine services, inspection firms, logistics and maintenance businesses across South Wales and the South West.
What pre-qualification asks for
Developers and tier 1 contractors use supplier pre-qualification to filter bidders, and insurance is one of the first sections. Expect to be asked for:
- Certificates for employers' liability, public and products liability and professional indemnity, with limits
- Confirmation that cover extends to offshore and port work
- Whether your policies include contractual liability and allow waivers of subrogation
- Your claims history and any HSE enforcement
- Health and safety accreditations, such as ISO 45001, and offshore training records
If you can't show the right cover, you may be scored down or excluded before your technical bid is read.
The gaps we see in Welsh supplier policies
| Gap | Why it matters |
|---|---|
| Offshore or vessel exclusion | Cover stops the moment staff work on a turbine, substation or vessel |
| £5m public liability | Below the £10m many offshore contracts ask for |
| No contractual liability | Indemnities you sign may be uninsured |
| No professional indemnity | Design, survey and inspection errors are not covered by liability policies |
| Low customer property limits | Components in your yard or workshop can be worth millions |
| Tools cover limited to the UK mainland | Kit taken offshore or overseas may not be insured |
How to prepare before you bid
Get the insurance schedule from the tender pack early and send it to your broker with your current policies. Many gaps can be fixed by extending existing cover, but some need a specialist offshore liability market, and that can take a few weeks. Having certificates ready that already match the contract makes you a lower-risk supplier in the eyes of the buyer.
It also helps to have your training and safety records in order. Underwriters will ask about GWO or offshore safety training, permit to work systems and how you supervise subcontractors. The same documents usually go into the pre-qualification questionnaire, so the work isn't wasted.
Frequently asked questions
Who are the Celtic Sea developers?
The three Round 5 sites were awarded to Equinor, Gwynt Glas (EDF power solutions and ESB) and Ocean Winds. Each is around 1.5 GW.
When will Celtic Sea work start?
Development, survey and port work is already under way. Construction is expected later in the decade, with first power by the mid-2030s, so suppliers are pre-qualifying now.
Can I use my existing contractor insurance for offshore wind work?
Only if it covers offshore and port work at the limits the contract requires. Many SME policies don't, so check before you bid.
Do I need different insurance for floating wind compared with fixed-bottom wind?
The covers are similar, but floating wind involves more port-side assembly and towing, so cover for customers' components, quayside work and marine operations is more important.
Related guides
- Offshore wind supply chain insurance
- Port fabrication yard insurance
- Knock-for-knock indemnities and insurance explained
- Offshore wind O&M contractor insurance
- Rope access and blade repair technician insurance
- Welding and fabrication insurance









Instagram
LinkedIn